This boat is being built in the USA - the first for quite a
few years. Vacuum bagged carbon over male mould, built 2001.
 |
|
Placing the breather for the vacuum. |
 |
|
Bagging the hull. This was then repeated twice
more to bag on flair and topsides foam, and then bottom and gusset
foam. |
 |
|
Vacuum Bag over the bow area |
 |
|
Shell from bow ready for outer skin. Guidelines
used to get the bottom symmetrical. |
 |
|
Foam shell ready for outer skin. |
 |
|
Bow area ready for outer skin. Diagonal lines
guide fabric overlap. |
 |
|
Flares and mid section before outer skin. Note
ply pad at front of flair for shroad loads, and guidelines for
UD. |
 |
|
Carbon, finishing glass, peelply, release film,
breather/bleeder and bag on. Bagging down. |
 |
|
Vacuum bag the bow area. Dark dots show excess
epoxy vacuumed out. |
 |
|
Ply bowsprit/snout support strut. This will get
some UD and glass later. |
 |
|
Complete Shell off mould. The next job is the
false floor. |
 |
|
Completed shell again. |
All photos (c) Skip Kovacs.